Irrigation Projects

Arrow
Arrow
ArrowArrow
Slider

Grade 3 irrigation and drainage sub-networks and equipping and modernization of five districts of Dasht Abbas

 

Work volumes:

  • 85 series of grade 3 irrigation channel with a length of 98610 meters.
  • Construction of related structures including a variety of dividers, ponds, flumes and culvert in the amount of 1600.
  • 50 series of grade 3 drains with a length of 63920 meters.
  • Implementation of 800 technical drainage facilities including culvert, drop, grade 4 to 3 drainage structure, drainage end structure.
  • Technical leveling and implementation of inter-farm roads at 4000 hectares
  • The total volume of land operations is 1,500,000 cubic meters.

 

 

Title of the project: Construction of an irrigation and drainage sub-network of D3 Development Unit Miandarband lands

Employer: Agricultural Jihad Organization of Kermanshah Province

Consultant: Maroon Consulting Engineers

 

This project is located in Kermanshah province, 35 km from Kermanshah-Sanandaj Road in crossroad of Ravansar. Due to the construction of a water transfer tunnel to Gavoshan plain, this plain is prone to irrigation and drainage networks in different conditions, which is divided into 9 districts.

 

Project Specifications:

  • Construction of a channel and accessories plant
  • Production of channel and accessories: 112 km
  • Installation of pre-fabricated channel with a length of 112 km
  • Construction of inter-farm roads with a length of 112 km
  • Construction of a technical buildings of 900 units
  • Approximate size of excavation: 4500000 cubic meters
  • Approximate size of embankment: 6000000 cubic meters

 

 

 

 

Arrow
Arrow
ArrowArrow
Slider

Title of the project: Construction of an irrigation and drainage sub-network of D5, 6, 7 Development Unit Miandarband lands

Employer: Agricultural Jihad Organization of Kermanshah Province

Consultant: Water Resources Consultant Engineers

 

This project is located in Kermanshah province, 35 km from Kermanshah-Sanandaj Road in crossroad of Ravansar. Due to the construction of a water transfer tunnel to Gavoshan plain, this plain is prone to irrigation and drainage networks in different conditions, which is divided into 9 districts.

 

Project Specifications:

  • Production of channel and its accessories: 32 km
  • Installation of pre-fabricated channel with a length of 1 km
  • Construction of inter-farm roads with a length of 90 km
  • Construction of a technical buildings of 450 units
  • Approximate size of excavation: 3500000 cubic meters
  • Approximate size of embankment: 4500000 cubic meters