previous arrow
next arrow
Slider

Six line alignment from Zaer bridge to Barekat Parking

Client: Ilam state Road and urban development office.

Consulting engineering: Rozhin

Description: Because of a high- volume traffic and strategic location this road will be the shortest one connecting south- eastern zone of Ilam province to Iraq.

Project specifications:

Location: Mehran axis

Length: 0.00 + 5.5

Cut: 48000 m3

Fill: 16000 m3

Concrete: 5842 m3

Rebar: 180 ton

Formwork: 12500 m2

Base & Subbase: 25000 m3

Asphalt: 870000 m2

Guardrail: 5000 ml.