previous arrow
next arrow
Slider

Grade 3 irrigation and drainage sub-networks and equipping and modernization of five districts of Dasht Abbas

Work volumes:

  • 85 series of grade 3 irrigation channel with a length of 98610 meters.
  • Construction of related structures including a variety of dividers, ponds, flumes and culvert in the amount of 1600.
  • 50 series of grade 3 drains with a length of 63920 meters.
  • Implementation of 800 technical drainage facilities including culvert, drop, grade 4 to 3 drainage structure, drainage end structure.
  • Technical leveling and implementation of inter-farm roads at 4000 hectares
  • The total volume of land operations is 1,500,000 cubic meters.