Construction of an irrigation and drainage sub-network of D5, D6,D 7 Development Unit Miandarband lands

Employer: Agricultural Jihad Organization of Kermanshah Province

Consultant: Water Resources Consultant Engineers

 

This project is located in Kermanshah province, 35 km from Kermanshah-Sanandaj Road in crossroad of Ravansar. Due to the construction of a water transfer tunnel to Gavoshan plain, this plain is prone to irrigation and drainage networks in different conditions, which is divided into 9 districts.

 

Project Specifications:

  • Production of channel and its accessories: 91 km
  • Construction of inter-farm roads with a length of 91 km
  • 43 series of grade 3 drains with a length of 60000 meters.
  • Construction of a technical buildings of 725 units
  • Approximate size of excavation: 3500000 cubic meters
  • Approximate size of embankment: 4500000 cubic meters